About Cable CPE Management

WinTrack SETS is the CATV leader in reducing the expense of replacing lost CPE impacts one of your largest balance sheet items - subscriber equipment  (also known as CPE). This is achieved through the effective management of CPE acquisition, storage, maintenance and life cycle which allows MSOs to reduce capital expenditures and operating budgets associated with CPE management.

 

For more information contact

chris.kluis@mintek.com

Subscribe by Email

Your email:

Follow Me

CPE Management 101

Current Articles | RSS Feed RSS Feed

Why Convert Distribution to a Hub and Spoke Model

  | Share on Twitter Twitter | Share on Facebook Facebook | Submit to Digg digg it |  Add to delicious  delicious |  Submit to StumbleUpon StumbleUpon |  Share on LinkedIn LinkedIn |  Share On Technorati Technorati | Submit to Reddit reddit 

A hub and spoke model is essentially a centralized distribution system where customer premise equipment (CPE) inventory is processed and then shipped to smaller nodes or directly to consumers. The smaller nodes may be smaller warehouses, office locations, local pickup and drop-off locations. Converting to a hub and spoke model has significant advantages for cable companies which include:

Advantages

  • Reduced Capital for Inventory  and Lowering Facilities Costs are the primary reasons to convert to a hub and spoke distribution system
    • Reducing the number of warehouses significantly reduces rent and other building expenses such as utility and maintenance expenses. In addition, lower operational and administrative overhead is achieved as taxes, insurance, telephone and other facility overhead is eliminated.
    • Reducing the number of warehouses and centralizing inventory dramatically decrease the the amount of inventory carried. Only the hub needs to carry a lengthy supply and nodes can switch to a more economic Just-in- Time inventory method.
    • Moving equipment between the becomes easier as logistics becomes simpler to manipulate.
  • Increased Efficiencies as specialization takes the place of generalist perfoming multiple tasks. Functions positively impacted by centralization are
    • Testing
    • Diagnostics
    • Cleaning
    • Repacking
    • Box and Set up
    • Speed of moving CPE between facilities and to the consumer increases.
  • Economies of scale result in cost savings
  • in all aspects of operations.
    • Mass shipping and receiving of larger quantities will lower inbound and outbound shipping costs
    • Larger more efficient equipment i.e copiers, labeling equipment etc., replaces smaller less used equipement at remote locations lowering maintenance and repair expenses
    • Centralized purchasing lowers per unit, shipping and administrative time as operating supplies can be purchased in larger quantities
    • Inventory control is better by not having to reconcile as many locations
    • Duplication or elimination of software packages and administrative tasks
  • Lower CPE loss
    • Ability to perform am accurate serialized inventory is enhanced. A serialized reconciliation provides detailed CPE information traceable by the serial number on each piece of equipment.A full reconciliation tells you what is missing by gathering all records for the specified location from the billing system and then comparing it to the scanned data. Fewer locations needing to be reconciled means better control and less CPE loss.
    • Outside vendor repairs shops can be minimized as economies of scale are developed thus reducing missing CPE

Drawbacks: A hub and spoke system does have potential drawbacks and these should be recognized and planned for with contigency plans or adjustments.

  • Bottlenecks: From an operational standpoint the central hub has the potential to become a non-functioning bottleneck especialy with regard to weather and other environmental problems. In addition to weather related issues, poor operations management can negate virtually all of the above listed advantages to the point where customers must wait extended periods of time to receive CPE thus impacting revenues.
  • Reduced Flexibility: Other drawsbacks include flexibility that smaller operations have over larger operations. Problems and issues that may be of concern to a particular location are now lumped into a bigger pot and may not receive the attention they need. This is an operations management issue to be thought out before conversion.
  • Not all tasks can be centralized: For example CPE resets have historically been performed by the location that the CPE originated from. Plans should be made to accommodate these types of issues.

Conversion to a hub and spoke model is a competitive necessity. Approximately 40% of cable operators operate on a hub and spoke model of some degree. The cost advantage to these operations is likely to be magnified as revenues flatten due to economic times or competitive forces.

 

Comments

Currently, there are no comments. Be the first to post one!
Post Comment
Name
 *
Email
 *
Website (optional)
Comment
 *

Allowed tags: <a> link, <b> bold, <i> italics